UHPC Overlay Research

West Deptfrod Twp., NJ

The UHPC Overlay Research Project Contract B (South) consists of the reconstruction of the bridge deck on I-295 / US-130 NB over Mantua Creek. This demolition scope of work includes milling of the existing roadway, hydro-demolition of the bridge deck & deck joint headers, and Type B & Type C deck repairs. This project also includes the installation of Ultra High Performance Concrete (UHPC), which is an up-and-coming technology in the construction industry. The bridge deck will be overlaid with 1-1/2” of UHPC with 2” of hot mix asphalt overlay on top. UHPC will also be installed at the deck joint headers.